Areas of application

Taking into consideration: DIN EN 1269

A distinction is drawn between new build and renovation. Every area of application is divided into 3 different floor build-ups.

Version A
Ceilings above heated rooms


Version B
Ceilings above unheated or periodically heated rooms or directly on earth


Version C
Ceilings over areas with external air temperature


Floor build-up New-build

Floor build-up Renovation


Name Size Date
AIRCONOMY® areas of application.pdf2 MB23.06.2015